Cuesta College SLO & NCC Campus - Asphalt Repair Project - Phase 2

PHASE 2 - Generally the proposed project consists of a combination of New Asphalt Pavement, Grind and Overlay existing, or Slurry Seal existing, raising existing manholes, storm drain catch basins, vaults, and new striping and signage to numerous existing asphalt parking lots, replacement in kind of degraded existing concrete flatwork, and Accessibility Upgrades at several locations on the Cuesta SLO Campus and Parking Lot 11 at the North County Campus including all traffic control, temporary traffic signage, flagmen, etc. to safely direct traffic during construction activities.

Status

Bidding Closed

Bid Date9/8/20 10:00 am

Company

Cuesta College

Location

San Luis Obispo and Paso Robles