Cuesta College SLO Campus Electrical Site Infrastructure Improvements Project

Removal, legal disposal, and replacement and commissioning of three 5-way pad mount switchgear with vacuum switches, one 4-way pad mount switchgear with vacuum switches, and replacement run of 12KV cable between SVS-3 & SOS-15 with new as shown in the contract documents.
  Project Drawings (click to expand/collapse)
Name Size
01 E-1 655.5 KB
02 E-2 423.5 KB
03 E-3 2.8 MB
04 E-4 165.3 KB