Cuesta College SLO Campus Electrical Site Infrastructure Improvements Project

Removal, legal disposal, and replacement and commissioning of three 5-way pad mount switchgear with vacuum switches, one 4-way pad mount switchgear with vacuum switches, and replacement run of 12KV cable between SVS-3 & SOS-15 with new as shown in the contract documents.

Status

Bidding Closed

Bid Date6/11/20 10:00 am

Company

San Luis Obispo Community College District

Location

San Luis Obispo, CA