Cuesta College SLO Campus Electrical Site Infrastructure Improvements Project

Removal, legal disposal, and replacement and commissioning of three 5-way pad mount switchgear with vacuum switches, one 4-way pad mount switchgear with vacuum switches, and replacement run of 12KV cable between SVS-3 & SOS-15 with new as shown in the contract documents.
  Bid Clarification 01 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Site Elect. Infrastructure - Bid Clar #01 213.7 KB
  Bid Clarification 02 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Cuesta Site Elect. Pre-Bid 02 338.7 KB